For Employers
Lead Process Engineer - Absheron project
3 hours ago
Posted date
3 hours ago
N/A
Minimum level
N/A
Airswift is currently recruiting for a Lead Process Engineer who will work for an international energy company in Paris or London for a 12 months renewable contract starting as soon as possible:

The service holder is starting from the FEED phase sanction with the possibility to continue to the EPC phase until the completion of the Development phase including Project close-out. The offshore subsea gas pipeline will be tied into the greenfield onshore Central Processing Facility (CPF) for Gas Condensate separation and compression. The service holder will lead process discipline for the CPF facility during FEED preparation and execution. The service holder may also be involved in the current pre-feed extension studies. The Service Holder will be as well deeply involve in the FEED scope of work preparation until FEED sanction. During FEED, the service holder will be in charge of the performance of the FEED CTR on time and on budget FEED deliverable submission for her or his scope of work and as well actively participate in the EPC CFT preparation. The Service Holder willl have numerous interfaces with other disciplines and entities including the partner BP at the Sangachal main facilities and the Azeri TSO for the AzerEnerji Grid connection to the CPS plant electrical substation.

Service holder shall adher to the Company Code of Conduct, Vision, Values and Behaviors, as supported by the Safe System of Working including Accountability of Safety. The service holder will perform this work in accordance with JOCAP and Project rules, guidelines and procedures

The service holder must possess strong experience in Process discipline in particular Gas Processing facilities and MEG regeneration for onshore plant.

The Service holder shall:
? lead the process studies, design and ensure compliance to project specifications of the CPF for the FEED studies and then during EPC phases
? To ensure the correct definition of the reference framework applied to the studies, the correct definition/identification of the list of deliverables expected at the end of the study, in line with the desired estimation class,
? To carry out or participate in the Value Engineering necessary to optimize the technical engineering, make it coherent before entering the FEED or EPC phases,
? To ensure adequate inputs for the LLI definitions and associated CFT
? To ensure process deliverables are of high quality for EPC CFT
? To promote proven engineering solutions to ensure the safety, operation and maintenance of installations; support innovative solutions when they lead to CAPEX and/or OPEX optimizations,
? To participate in technical reviews, HAZID, HAZOP, workshops, ad hoc meeting as appropriate
? To ensure the timely review of the FEED contractor process documents and ensure timely review and approval of the deliverables.
? Identify, monitor and expedite interfaces with other packages development that may affect the discipline
? To contribute to the tendering process, Exhibits preparation and participate in technical clarifications phase for his or her discipline
? To ensure compliance with industry standards and best practices. ? Ensure any technical query and deviation requests are accurately monitored, replied to, and expedited in an appropriate timeframe
? To ensure close communication and reporting to FEED CPF ENGINEERING LEAD and CPF package manager about the progress of his or her discipline, any technical issue or blocking points in a timely manner.
? Provide process documentation and operating instructions. Create, configure and develop industrial processes.

The Absheron Conventional Gas & Condensates field is located offshore Azerbaijan Republic in the Caspian Sea in 500 meters depth, at about 100km southeast of Baku, 25km north-east of Shah Deniz field and 34km south of Oil Rocks production and processing facilities. The project aims at supplying natural gas for both domestic market via Sangachal main facilities (condensate) and for international export market via the South Caucasus Pipeline (SCP).

- Starting date: as soon as possible
- Duration: 12 months
- Renewable: YES
- Location: PARIS or LONDON during FEED (FEED contractor will be based in UK - LONDON) and then at EPC contractor location. - Status: residential

Qualification:
Lead discipline -
Languages: English -
Professional Experience: More than 15 years
Experience within project: More than 15 years
Related tags
-
JOB SUMMARY
Lead Process Engineer - Absheron project
Courbevoie
3 hours ago
N/A
Full-time