RINA is in bidding phase for a PMS contract, relevant to a FLNG construction.
Main scope of hull and topside fabrication will be executed in South Korea, where all integration activities will be carried out.
Part of hull structural blocks, and part of topside process modules will be pre-fabricated in different yards in China (Qidong) and Vietnam (Quang Ngai Province), for subsequent integration in South Korea.
The Turret and Mooring system will be fabricated in Malaysia (Johor).
Duration of the services to be performed: 36 months
Starting date: Q4 2025
We are looking for the following SENIOR positions:
LOCATION |
Position |
CHINA |
TOPSIDE STRUCTURE SITE CONSTRUCTION COORDINATOR |
VIETNAM |
TOPSIDE PIPERACK SITE COORDINATOR |
KOREA |
FLNG COMPLETION COORDINATOR |
KOREA |
DEPUTY CONSTRUCTION MANAGER |
KOREA |
PROJECT CONTROL AND REPORTING COORDINATOR |
KOREA |
MATERIAL CONTROLLERS HVE |